免费在线看黄色视频,久久精品视频在线,中日韩还a免费大片,亚洲天堂视频在线,国产精品沙发午睡系列99,亚洲精品v欧洲精品v日韩精品,国产精品无线观看免费,免费观看成年人视频

Hydrolyzed pan waste steam dealing process


Summary

The discharge pressure of hydrolyzed is 0.2MPa, the Moisture in furfural scraps is steamed instantly, the process collect waste steam by draught fan and then condensate ,wash and recycle part of furfural in waste steam, and eliminate waste residue flash steam when discharging to improve the production environment.

Second, the process flow chart:blob.png

Service hotline: 0538-3399066;0538-3393566;0538-3393266

Fax: 0538-3399066

Zip code: 271600

Address: Feicheng High-tech Industrial Development Zone, Shandong Province




© 2022 Shandong Jinta Machinery Group Co., Ltd. All rights reserved. 




技術支持:掘金科技

WeChat

WeChat

WeChat

WeChat

Wechat

Wechat